Full Detailed Agenda
Every scheduled session, from the opening welcome through to closing remarks. Programme and speaker allocations are subject to change.
09:00Registration & NetworkingDelegate Registration and Networking
Explore session details+
Delegate Registration and Networking
Explore session detailsBadge collection, refreshments and conversations with fellow delegates and partners.
09:45IntroductionMC Event Introduction and Welcome
Explore session details+
MC Event Introduction and Welcome
Explore session detailsWelcome to the Specialist Construction Summit and an overview of the day.
10:00Welcome AddressWelcome Speech
Explore session details+
Welcome Speech
Explore session detailsJason Saundalkar, CPI Trade Media, welcomes speakers and delegates and introduces the themes and objectives of the summit.
10:15Keynote AddressTBC
Explore session details+
TBC
Explore session detailsContent to be announced soon.
10:30First Panel DiscussionMoving Forward with Leisure & Hospitality
Speakers to be announced
Explore session details+
Moving Forward with Leisure & Hospitality
Speakers to be announced
Explore session detailsThe Middle East has an extensive pipeline of leisure and hospitality projects. Industry data notes that the hotel pipeline stands at 724 projects and over 178,000 rooms. The leisure segment is equally impressive with a strong pipeline of amusement parks, gaming resorts, sports venues and others planned for handover within the next 10-years. This panel discussion brings together regional experts to discuss:
Talking points:
- The state of the existing construction supply chain (consultants, Tier 1 contractors etc) and its ability to deliver these significant pipelines, taking into account the strong build pipelines in other segments in the region (data centres, hospitals, residential etc)
- The impact of 2026 regional geopolitics on near- and long-term leisure and hospitality construction and demand. What has happened so far, and what is likely to happen in the future if the current situation persists into 2027? Should the regional situation come to a conclusion before the end of the year, when could a rebound occur, and what will that mean for the construction supply chain, and the delivery of these complex projects?
- In cases where opening dates cannot be moved due to tourism targets, mega-events etc, and accelerated construction schedules are rolled out, how can risks such as cost overruns, rework, quality compromises etc be avoided? Is vertical integration and bringing contracting in-house a viable option for larger asset owners?
- Modular construction can support the delivery of leisure and hospitality projects but where does the region stand in terms of modular capacity? What are the pros and cons of leveraging modular construction on these projects?
- Common causes of multiple problems on leisure and hospitality projects in the region (and beyond) are usually attributed to late systems/technology integration. This can lead to costly rework and redoing of certain project areas; why does this still happen and how can this challenge be avoided?
- What can governments put in place to attract international construction firms – mainly Tier 1 contractors – to set up shop in key GCC markets to support the delivery of these massive project pipelines? What can governments do to support contractors and the broader supply chain that’s already operating in the region?
Moderator to be announced
Speakers to be announced
11:20Presentation OneTBC
Explore session details+
TBC
Explore session detailsContent to be announced soon.
11:40NetworkingCoffee Break & Sponsor Breakout Session
Explore session details+
Coffee Break & Sponsor Breakout Session
Explore session detailsCoffee and networking, with a sponsor breakout session subject to confirmation.
12:00Second Panel DiscussionGround Engineering as a Value Driver
Reducing risk, improving efficiency and delivering better returns through specialist geotechnical solutions.
Speakers to be announced
Curated By
Explore session details+
Ground Engineering as a Value Driver
Reducing risk, improving efficiency and delivering better returns through specialist geotechnical solutions.
Speakers to be announced
Curated ByFrom ground investigation and soil improvement to deep foundations and enabling works, specialist geotechnical solutions are essential to complex construction projects. Early engagement with ground engineering specialists can minimise risks, improve constructibility, reduce costs and accelerate delivery, ensuring stronger project performance and long-term value.
Curated ByModerator to be announced
Speakers to be announced
12:45Presentation TwoTBC
Explore session details+
TBC
Explore session detailsContent to be announced soon.
13:10NetworkingLunch & Sponsor Breakout Session
Explore session details+
Lunch & Sponsor Breakout Session
Explore session detailsBuffet lunch, networking and exhibition activities, with a sponsor breakout session subject to confirmation.
14:10Third Panel DiscussionDelivering Hyperscalar Datacentres
Speakers to be announced
Explore session details+
Delivering Hyperscalar Datacentres
Speakers to be announced
Explore session detailsAccording to industry reports, the global data centre pipeline is expanding rapidly as a result of drivers including cloud computing demand, artificial intelligence (AI), data sovereignty etc. The global pipeline of projects is estimated to be US $2.9tn, with the Middle East and key markets such as the UAE and Saudi Arabia highlighted as the biggest drivers of growth. While the ambition and demand exists, there are also a number of challenges that must be overcome. This panel discussion will explore:
Talking points:
- Which construction model works best to deliver data centres in the current climate and during peacetime? Where are the risks with these models and how can the construction supply chain mitigate these risks?
- A S&P Global report published in October 2026 highlights the UAE and Saudi Arabia as key drivers of data centre growth in the Middle East. Both countries have gigawatt-scale ambitions for data centre infrastructure, with deliveries planned between now and 2030 in the near term. How can these ambitions be achieved taking into account existing supply chain and logistics challenges now and anticipated challenges in the future?
- Following regional escalations and disruptions to existing data centre infrastructure, how can data centre resilience and physical security be enhanced to ensure continuity of service? What measures can be taken to increase redundancy and harden data centre facilities from a design and construction standpoint? Can existing data centre facilities be upgraded effectively or is new build the only answer?
- Along with access to physical processors for dense data centre builds, power- and cooling-requirements are frequently highlighted as key constraints when selecting site locations, and designing/building hyperscalar datacentres. Are onsite renewable energy systems and BESS the solution to power challenges? And as immersion liquid-cooling is increasingly seen as a solution to cooling challenges, how does this impact MEP design and facility commissioning?
- In certain cities, data centres being built in close proximity to homes and wildlife habitats are causing major stress and disruptions to humans and wildlife alike. The primary issues are noise, local warming, and pollution. What regulations exist or need to be put in place to ensure that this does not happen in Middle East cities?
Moderator to be announced
Speakers to be announced
14:50Presentation ThreeTBC
Explore session details+
TBC
Explore session detailsContent to be announced soon.
15:10Event wrap-upMC Closing Remarks
Explore session details+
MC Closing Remarks
Explore session detailsThank you for attending the 2026 Specialist Construction Summit.





















